13
Nov
The Cott Beverage USA project included demolition of 126,000 square feet of existing 4″ concrete slab inside an existing building and replacement of the slab with a structural slab of up to 12 inches. The scope included modification to the existing dock and addition of a new over head door opening.
Read More
13
Nov
The project involved the design and construction of a 105 foot metal dock canopy extension to the Frito Lay distribution center in McAllen, Texas. The work included concrete foundations, structural steel components, metal sheeting, and exterior finishes.
Read More
13
Nov
Pecos Construction provided and installed a custom built aluminum awning for the Pepsico headquarters in Plano, TX. Scope also included renovations to the exterior dock drive and sidewalk and a new exterior door with security hardware.
Read More