Pecos Construction was hired as the turnkey concrete subcontractor to build a 3 level, cast-in-place concrete parking garage. The garage is a slab on grade with cast in place columns and decks. The deck is post tensioned and is tied into pre-cast walls that are installed around the perimeter of the garage.
Read More
13
Nov
Pecos Construction was the concrete subcontractor for this 10 story, 50,000 square foot addition to the existing Joule Hotel on Main Street in downtown Dallas. The cast in place concrete frame addition was performed with very little room for construction activities on an expedited schedule.
Read More
15
Oct
The L3 Communications Concept building is a 50,000 sf tilt wall panel construction office building with a paint and dry stack stone veneer.