21
Nov
Project consisted of working in two area simultaneously; expanding the existing SIDA fencing and 100,000 sq. ft. of paving area and construction of new metal canopies with new sprinkler, lights, and gutters. This project included extensive coordination with the FAA and the Dallas Airport Security during construction operations.
Read More
21
Nov
This project was a complete remodel of the cafes in both buildings. All new millwork, paint, ceilings, flooring, accents and furniture. As well as some new features in the atriums, new risers and benches.
Read More
21
Nov
This project was a revamp of the accent walls on all floors of both buildings. The two tone blue walls were called the Precision Cloud walls and the red wall is the Diagonal wall.
Read More
13
Nov
This was a two phase project to update the kitchen and cafeteria of the Training and Conference Center and to upgrade the boiler systems in the building. The first phase included new flooring and new floor wall tile in the kitchen, new tile in the cafeteria, a new grease waste piping system and multiple boilers
Read More
15
Jan
Project is a new ground up 5,500 square foot metal building with warehouse space and offices. Project scope consisted of Site Utilities, Excavation, Concrete Building Foundation, Site Paving, Building Erection, MEP, and Finishes. Project is located with secure regulated area of Dallas Love Field Airport.
Read More